Lithia Park East Hillside Mountain Bike Trails

Proposal to add beginner-level bicycle trails flowing to-and-from downtown Ashland.

The project aims to construct a safe, beginner-friendly, and adaptive-accessible link between downtown Ashland and the existing mountain bike trails in the Ashland Watershed.

At a Glance

  • Location: Glenview Hillside (connecting the Glenview Street quarry parking area to Pioneer Street)

  • Trail Length: ~1 mile total (~0.5 mile downhill trail / ~0.5 mile uphill trail)

  • No new funds required: estimated ~$30,000 (funded via the existing APRC CIP trail budget)

  • Target Audience: Beginners, adaptive riders, families, and riders seeking a car-free link to downtown

  • Separates Trail Groups: retains existing mapped hiker-only trails. Continues proven watershed trail formula of separating user groups in areas close to town.

Key Highlights & Benefits

  • Ashland’s First True Beginner & Adaptive Trail: Features low gradients (4% or less throughout) and wide, machine-built tread (3–4 feet) to accommodate adaptive bikes and novice riders.

  • Designed for Safety: Features high visibility at intersections with existing pedestrian trails, featuring short uphill sections before intersections to naturally check downhill rider speed.

  • Eliminates Road Hazards: Bypasses narrow roads with blind corners and heavy vehicular traffic (including the Lithia Park "gauntlet") to create a safe, car-free connection for cyclists entering and exiting downtown.

  • Economic Boost for Local Businesses: Directs cycling traffic straight to downtown shops, restaurants, and parking, allowing local and visiting riders to access pre- and post-ride services.

  • Wildfire & Safety Surveillance: Increases regular usage on an underutilized hillside prone to illegal camping, providing more visibility and early detection for potential fire hazards.

  • Erosion & Trail Management: Reduces unsanctioned "volunteer" trails and skidding on pedestrian paths by providing a dedicated, professionally engineered route.

1. Trail Specifications & Design

  • Downhill Trail: Machine-built by a professional contractor; smooth, low-angle, flowing singletrack with undulating features (rollers) that allow riders to slow down naturally without heavy braking.

  • Uphill Trail: Hand-built, narrower singletrack designed with a steady, manageable climbing grade running in the opposite direction.

  • Crossings & Visibility: Designed with high visibility at intersections with existing pedestrian trails, featuring short uphill sections before intersections to naturally check downhill rider speed.

2. Location & Connectivity

  • Upper Terminus: Quarry parking area on Glenview Street (connecting to BTI, Jabberwocky, Snark, and Bandersnatch trails).

  • Lower Terminus: Dirt section of Pioneer Street, leading riders directly toward downtown and the Hargadine paid parking structure.

3. Construction Plan & Budget

  • Estimated Cost: Approximately $30,000 based on comparable projects (e.g., Wasabi Trail).

  • Funding Source: APRC Capital Improvement Project (CIP) trail budget.

  • Timeline: Professional machine build anticipated to take 2–3 weeks, followed by volunteer finishing work.

4. Maintenance & Stewardship

  • Lead Volunteer Groups: RVMBA, Ashland Devo, and local trail stewardship organizations.

  • Schedule: Two dedicated volunteer workdays per year during the rainy season (November–March).

  • Long-Term Plan: Periodic machine cleanup/reset every 3 to 5 years, subject to budget and usage needs.

Environmental & Community Impact

  • Flora & Fauna: Low footprint; construction avoids major trees (>10" DBH) and focuses on clearing brush. Minimal impact relative to existing human activity in the adjacent Lithia Park corridor.

  • Traffic & Parking: Eases vehicle and parking congestion at upper watershed trailheads by enabling riders to pedal directly from downtown or their homes.

  • Fire Safety: Situated primarily in Fire Unit UL-5 (rated Extreme). Increases community presence on the hillside and breaks up fuel continuity.

Frequently Asked Questions